Things are leaking.
Today it decided to finally rain after being dry for quite a long time. And it really decided to rain. The caravan which we were actively renovating is quite wet inside.

Average photo, but you can see it a bit shiny.
Little girl has been sick, not real happy about that either. I also had a doctors appt I almost missed this morning due to being up all night taking care of her.
The shed roof I patched a week or so ago also didn't hold up. I was lazy and learnt the hard way I can't just cut corners as water has a way of getting through little cracks.
Water is possibly the worst.
I finally completed my home assistant integration for the new breaking firmware (2.8.0) for my Daikin heatpump.
https://github.com/Apoc182/local_daikin
I also managed to swap the side my daughter's bedroom door swung from. Swing away from the space, as they say (I think).


Got a new heat pump installed. Specifically got the WiFi model so I could integrate it with homeassistant. Came with a firmware update where the developers have completely reworked the API and broken the existing Daikin homeassistant integration. I didn't want to wait so blindly slapping together my own integration, which I will release tarnish and all in the coming days.
Spent some time building a clock for DayZ servers as there is no way to know the time. Realised about half way through that the effort required was not really worth it.
Going to install a tablet on my lounge room wall. Will post when that's been done.